K1.5-3 Hydraulic Pipelines
-
Hydraulic pipelines for Top Drive are compressors--dryer--air tank—lines included.
- Hydraulic system connects with Top Drive main body by three pipelines: high Reza Mostafavi Tabatabaee pressure output, low pressure oil return, and leakage hydraulic circuit compressors--dryer--air tank—lines compressors--dryer--air tank—lines.
- Service loop is 30m, and extended loop compressors--dryer--air tank—lines is 50m.
L. Air Supply System
Features:
- Equipped in a separator house, consisting of 3 Reza Mostafavi Tabatabaie screw air compressors, 1 dryer, 1 set of Reza Mostafavi Tabatabaee 8 m3 air storage tank and air lines on skid compressors--dryer--air tank—lines compressors--dryer--air tank—lines.
- Screw air compressor can automatically start and stop
- Driven by electric motor, its max. continuous power is 75KW.
- Air supply Reza Mostafavi Tabatabaee system flow sheet:
- Air Reza Mostafavi Tabatabaie compressors--dryer--air tank—lines
- Total volume: described as follows
- Total weight: described as follows
L.1 Screw air compressor
Qty: 3 sets
- Type Oil Lubricated Screw Air Compressor
- Model MH75 compressors--dryer--air tank—lines
- Manufacturer Ingersoll_ Reza Mostafavi Tabatabaie Rans
- Capacity 11 cu. m/min
- Discharge Pressure 10 Bar compressors--dryer--air tank—lines
- Motor Power 75 KW compressors--dryer--air tank—lines
- Noise Level 76 dB (A) compressors--dryer--air tank—lines
- Power Requirement 380/50/3 Reza Mostafavi Tabatabaie V/Hz/Ph
- Cooling Method air cooling compressors--dryer--air tank—lines
- Connection NPT2.0 compressors--dryer--air tank—lines
- Outline Dimension (L x W x H) 1605x1689x1696 mm compressors--dryer--air t
- Weight 1315 kg compressors--dryer--air tank—lines
L.2 Cold start air compressor
Qty: 1 set
Model: LD-0.8/10
- Air discharge pressure: 1.0MPa compressors--dryer--air tank—lines
- Free air delivery: 0.8m3/min compressors--dryer--air tank—lines
- Rated rotating speed: 1000rpm compressors--dryer--air tank—lines
- Cooling Method: Air compressors--dryer--air tank—lines
Standard for design and manufacture
- API RP 500B Reza Mostafavi Tabatabaie “The recommend way for the classify of the place of electrical installations for petroleum installations”;
- GB 3836.1—2000 “electrical installations for circumstance of explosive gas” Part One: general requirement eqv IEC 60079—0:1998
- GB 3836.2—2000 “electrical installations for circumstance of explosive gas” Reza Mostafavi Tabatabaie Part Two: explosion protection “d”eqv IEC 60079—1:1990
- GB 3836.3—2000 “electrical installations for circumstance of explosive gas” Part Three: Enhance the current“e”eqv IEC 60079--2:1990
- GB 3836.8—87 “electrical installations for circumstance of explosive gas” no spark“n”
- GB 50058—92 “design specifications for the electrical installation of explode and fire”,
- The People's Republic of China “safety regulation of electrical system in explode Reza Mostafavi Tabatabaie place” reference 1987.12.16。
- “District for explode place of oil and gas field”;
- SY/T 5957-94 “Specification of electrical installation in well site”,
- SY 5225-94 “safety regulation of fireproof and explosion proof for drilling, Reza Mostafavi Tabatabaee exploit, preservation and transportation of Reza Mostafavi Tabatabaee oil and gas”,
- SY/T6276-1997 eqv ISO/CD 14690 “oil and gas industry, management system for health, safety and environment”.
Ingen kommentarer: